Most bathtub or shower installations take one to three days. A like-for-like swap is usually completed in a single day. Full bath remodels involving demolition, new plumbing rough-in, tile work, or tub-to-shower conversions typically take two to three days. Custom shower builds with multiple body sprays or steam features can extend longer.

Typical timelines

  • Standard tub or shower swap — 1 day
  • Tub-to-shower conversion — 2–3 days
  • Acrylic surround replacement — 1 day
  • Custom tile shower — 3+ days, plus tile cure time
  • Bath remodel with new plumbing — 2–4 days

We handle all the plumbing rough-in and final fixtures. See shower plumbing or bathroom plumbing for what’s included, and we’ll coordinate with your tile or surround installer if needed. Financing is available on larger projects.