The process of upgrading or rewiring a home’s electrical system starts with a walkthrough and load calculation, followed by a written estimate, permit acquisition, the electrical work itself, a rough-in inspection (for rewires), drywall patching, and a final inspection. A panel-only upgrade typically takes one day; full rewires can run several days to a week depending on home size.
Step-by-step
- In-home assessment and load calculation
- Written, flat-rate estimate
- Permit pulled with local jurisdiction
- Power shut off; new panel or new circuits installed
- Rough-in inspection (if walls were opened)
- Drywall patches, final connections, and trim
- Final inspection and homeowner walkthrough
We manage every step. See panel upgrade service, full wiring and rewiring, and pair with electrical inspections before and after.