Aeroseal duct sealing typically takes a half-day to a full day for a single-family home — usually 4 to 8 hours from setup to teardown. The Aeroseal aerosol injection itself runs for about an hour once the ducts are pressurized; the rest of the time is dedicated to prep, sealing registers, and verification testing.
What to expect
- Initial duct-leakage measurement
- Mask off every supply and return register
- Connect Aeroseal machine to the duct system
- Inject the sealant aerosol while monitoring leakage in real time
- Final leakage measurement and certificate
The process is sealed-system, computer-controlled, and verifiable. Schedule through our Aeroseal duct sealing service, often paired with duct cleaning or duct inspection.