Most simple gas line installations are scheduled within 3 to 7 days and completed in 4 to 8 hours on the install day. Larger projects (full home gas piping upgrades, outdoor lines to fire features, multiple appliance branches) can take 1–3 days plus inspection scheduling. We always confirm the timeline up front.
Typical timing
- Single appliance run — Same-day or next-day install
- Range or stove conversion — 4–8 hours
- Outdoor fire feature or BBQ line — 1 day
- Whole-home gas piping — 2–3 days
- Permit + inspection wait — Add 1–3 business days
See our gas line installation service for a free in-home estimate.