Upgrading or rewiring a home’s electrical system follows a clear path: in-home assessment and load calculation, written estimate, permit, power shutoff, panel and/or circuit installation, rough-in inspection (for rewires), drywall patches, final connections, and final inspection. Panel upgrades take a day; full rewires take days to a week.
Project phases
- Assessment + load calculation
- Written, flat-rate quote
- Permit pulled
- Power shutoff and disconnect
- Panel and/or circuit work
- Rough-in inspection (if walls were opened)
- Patch and trim
- Final inspection and homeowner walkthrough
We manage every step. See panel upgrade service, full wiring and rewiring, and electrical inspections.