Upgrading or rewiring a home’s electrical system follows a clear path: in-home assessment and load calculation, written estimate, permit, power shutoff, panel and/or circuit installation, rough-in inspection (for rewires), drywall patches, final connections, and final inspection. Panel upgrades take a day; full rewires take days to a week.

Project phases

  • Assessment + load calculation
  • Written, flat-rate quote
  • Permit pulled
  • Power shutoff and disconnect
  • Panel and/or circuit work
  • Rough-in inspection (if walls were opened)
  • Patch and trim
  • Final inspection and homeowner walkthrough