After an electrical inspection, prioritize any safety issues first (loose connections, missing GFCIs, recalled panels, smoke-detector gaps), then schedule code corrections, and finally plan capacity upgrades for future needs. A good inspection report categorizes findings by urgency so you know what to do this month vs. next year.

Tackle issues in this order

  • Immediate — Recalled panels, exposed wiring, missing CO detectors, hot outlets
  • Within 30–90 days — Missing GFCI/AFCI protection, ungrounded outlets, missing smoke detectors
  • Within a year — Panel upgrades, full home grounding, surge protection
  • Future planning — Smart panels, EV chargers, additions

We help you prioritize and schedule everything. Get started with electrical repairs, panel upgrades, GFCI installation, and surge protection as needed.